{"id":3295,"date":"2026-07-29T10:16:58","date_gmt":"2026-07-29T10:16:58","guid":{"rendered":"https:\/\/m3-pg.de\/?post_type=project&#038;p=3295"},"modified":"2026-07-29T12:46:29","modified_gmt":"2026-07-29T12:46:29","slug":"destillenwerk","status":"publish","type":"project","link":"https:\/\/m3-pg.de\/en\/project\/destillenwerk\/","title":{"rendered":"Destillenwerk"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">The existing distillation building within a production complex was extended to provide additional space for the distillation processes and to optimise production workflows. Associated ancillary buildings for the required fire protection systems were also planned. The new building elements were functionally integrated into the existing production facilities.<\/p>\n","protected":false},"featured_media":3389,"template":"","meta":{"_acf_changed":true},"project-category":[19],"class_list":["post-3295","project","type-project","status-publish","has-post-thumbnail","hentry","project-category-industry"],"acf":[],"_links":{"self":[{"href":"https:\/\/m3-pg.de\/en\/wp-json\/wp\/v2\/project\/3295","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/m3-pg.de\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/m3-pg.de\/en\/wp-json\/wp\/v2\/types\/project"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/m3-pg.de\/en\/wp-json\/wp\/v2\/media\/3389"}],"wp:attachment":[{"href":"https:\/\/m3-pg.de\/en\/wp-json\/wp\/v2\/media?parent=3295"}],"wp:term":[{"taxonomy":"project-category","embeddable":true,"href":"https:\/\/m3-pg.de\/en\/wp-json\/wp\/v2\/project-category?post=3295"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}